View our Projects

Warwick University

Client:  Willmott Dixon Scheme:  Warwick University Location:  Coventry Value:  £124m Duration:  32 weeks on site Scope:  10,000+ sqft The redevelopment of the Arts Centre was a particularly high-profile...

Read More

Client:  Willmott Dixon Scheme:  Warwick University Location:  Coventry Value:  £124m Duration:  32 weeks on site Scope:  10,000+ sqft The redevelopment of the Arts Centre was a particularly high-profile...

Read More

78 St James, London

Client:  Bentall Green Oak Scheme:  78 St James Location:  London Value:  £50m Duration:  48 weeks on site Scope:  530,000 square foot The multi-million pound scheme has focused on providing world class...

Read More

Client:  Bentall Green Oak Scheme:  78 St James Location:  London Value:  £50m Duration:  48 weeks on site Scope:  530,000 square foot The multi-million pound scheme has focused on providing world class...

Read More

21 Moorfields, London

Client:  Blu & Sir Robert McAlpine Scheme:  21 Moorfields Location:  London Value:  £100m Duration:  50 weeks on site Scope:  470 square foot of office space This two-phase scheme saw us deliver...

Read More

Client:  Blu & Sir Robert McAlpine Scheme:  21 Moorfields Location:  London Value:  £100m Duration:  50 weeks on site Scope:  470 square foot of office space This two-phase scheme saw us deliver...

Read More

49a St Paul's Street, Leeds

Client:  Mayfair Investments Scheme:  49a St Paul's Street, Leeds Location:  Leeds Value:  £1.5m Duration:  50 weeks on site Scope:  9 Apartments & 1 Penthouse   Scheme...

Read More

Client:  Mayfair Investments Scheme:  49a St Paul's Street, Leeds Location:  Leeds Value:  £1.5m Duration:  50 weeks on site Scope:  9 Apartments & 1 Penthouse   Scheme...

Read More

Sky Innovation Centre

A new three-storey hybrid steel and cross laminated timber frame structure, designed to maximise natural light in a 77,000 sq ft open plan structure. The raking aluminium and glass ziggurat façade leads to a roof structure with a lightwell flooding...

Read More

A new three-storey hybrid steel and cross laminated timber frame structure, designed to maximise natural light in a 77,000 sq ft open plan structure. The raking aluminium and glass ziggurat façade leads to a roof structure with a lightwell flooding...

Read More

45 Nightingale Lane

Client: Red Construction Location: London Architect: Gibberd Architecture Contractor: Flatt Consulting This project involved the retention and conversion of Audiology House, a traditional small mansion built circa 1870, and the demolition and...

Read More

Client: Red Construction Location: London Architect: Gibberd Architecture Contractor: Flatt Consulting This project involved the retention and conversion of Audiology House, a traditional small mansion built circa 1870, and the demolition and...

Read More

67 Southwark Street (RC)

Client: TLS (Southwark) Ltd Location: London Architect: Allies & Morrison Contractor: RI Design & Build This sixteen-storey residential development occupies a slender site in the popular London borough of Southwark. A multifunctional ground...

Read More

Client: TLS (Southwark) Ltd Location: London Architect: Allies & Morrison Contractor: RI Design & Build This sixteen-storey residential development occupies a slender site in the popular London borough of Southwark. A multifunctional ground...

Read More

Camden Town Hall

Client: McLaren Construction Location: London We were appointed as the Temporary Works Engineers on the Camden Town Hall conversion project by McLaren Construction. This project involved the construction of three additional floors as well as the...

Read More

Client: McLaren Construction Location: London We were appointed as the Temporary Works Engineers on the Camden Town Hall conversion project by McLaren Construction. This project involved the construction of three additional floors as well as the...

Read More

Seaham Primary Care Centre

Client: Tees Valley & South Durham Lift Scheme Location: Seaham, County Durham Architect: P+HS Architects Contractor: Carillion Bridges Pound has been part of the team which has successfully delivered this and the previous projects at Barnard Castle...

Read More

Client: Tees Valley & South Durham Lift Scheme Location: Seaham, County Durham Architect: P+HS Architects Contractor: Carillion Bridges Pound has been part of the team which has successfully delivered this and the previous projects at Barnard Castle...

Read More

Great Marlow School

Client: Bucks County Council Location: Buckinghamshire Architect: Jonathan Holland Architects Project Manager: Clipston Construction Control This project involved the construction of a two storey braced steel frame, composite floors and metsec trussed...

Read More

Client: Bucks County Council Location: Buckinghamshire Architect: Jonathan Holland Architects Project Manager: Clipston Construction Control This project involved the construction of a two storey braced steel frame, composite floors and metsec trussed...

Read More

A4104 High Street – Pensnett Highway Improvement Works – Dudley

Location: West Midlands Contractor: Fitzgerald Contractors Ltd For this project we were requested to enable the widening of the existing highway, including the futureproofing of the underground drainage requirements as they relate to climate change....

Read More

Location: West Midlands Contractor: Fitzgerald Contractors Ltd For this project we were requested to enable the widening of the existing highway, including the futureproofing of the underground drainage requirements as they relate to climate change....

Read More

10-18 All Saints Street

Client: Regents Wharf Unit Trust Location: Isllington, London Architect: Hawkins Brown Project Manager: Bentall Green Oak The proposed new development of Regents Wharf is to reinvigorate the existing Site by refurbishing and extensions of 10-12 Regents...

Read More

Client: Regents Wharf Unit Trust Location: Isllington, London Architect: Hawkins Brown Project Manager: Bentall Green Oak The proposed new development of Regents Wharf is to reinvigorate the existing Site by refurbishing and extensions of 10-12 Regents...

Read More